Aggregates comprise as much as 60% to 80% of a typical concrete mix, so they must be properly selected to be durable, blended for optimum efficiency, and properly controlled to produce consistent concrete strength, workability, finishability, and durability (Photo 1).
Get price
The sand must be of proper gradation ( it should have particles from 150 microns to 4.75 mm proper proportion). Manufacture of the sand process involves three stages, crushing of stones into aggregates by VSI, then fed to Rotopactor to crush aggregates into sand to required grain size. Screening is done to eliminate dust particles and Washing ...
Get price
Sand. 0.475. cu.m. Gravel. 0.8344. cu.m. The following factors were already added an average wastage add-ons of around 5% to 8%. This numbers should help average Filipinos to know draft amount of materials needed for minor concreting works. To see all the material prices we have posted click here.
Get price
I'm preparing to pour a finish concrete foor, slab on grade. The structural plans call for 4″ compacted gravel base, insul-tarp vapor barrier, 2″ of sand and 4″ of concrete. [.]
Get price
Based on your concrete mix class and cement bag quantity, multiply your volume with the corresponding values from the concrete proportion table: SAMPLE PROBLEM 1. Compute for the quantity of 40kg cement bags, sand and gravel needed for a class "A" mixture slab that is 3 meters long, 2 meters wide and 0.150 meters thick. SOLUTION
Get price
Concrete quantity for Beam Sr.no. Description No. L in meter B in meter H in meter Quantity in cubic meter 1. Beam 1, 2 1 11.60 0.3 0.6 2.08 2. Beam 3 1 5.6 0.3 0.6 1.008 3.
Get price
For 1 ㎥ of Concrete = 226 Kgs of Cement is required. Calculation of Volume of Sand (Fine Aggregate) in 1㎥ of Concrete: Volume of sand= (sand/cement+sand+aggregate) x 1.54 Quantity of sand = (sand/total volume) x1.54 = (3/10)x1.54 = 0.462 ㎥ 1㎥ of sand = 1600-1800 kg Assume 1600 kg 0.462 ㎥ of sand =1600 x 0.462 = 739 kg
Get price
To calculate the quantity of cement, sand, and aggregates required for a flat slab first we need to calculate the volume. Area of flat slab = 1000 sq.ft =93 sq. m. The minimum thickness provided for the slab is 150 mm. ( According to IS 456) 150 mm = 0.15 metres. Hence Wet volume = Area of slab x Thickness of slab.
Get price
Summary: Quantity of Cement, Sand & Water required for Plastering. For 100m2 of Wall, if first & second coat of cement mortar ratio 1:5 & 1:3 laid then. The Quantity of cement required = 764.36 Kgs. Calculated Quantity of Sand (Fine aggregate) required = 3404.8 Kgs. Quantity of Water required = 834 litres.
Get price
1 : 3 : 3 MIX RATIO. To produce a 3000 psi cubic yard of concrete (27 cubic feet) the concrete mixture ratio is: 517 pounds of cement or (234kg) 1560 pounds of sand or (707kg) 1600 pounds of stone or (725kg) 32 - 34 gallons of water or (132L) This mixing ratio will give you a concrete mix that is strong, durable, and good for most concrete ...
Get price
Quantity of cement in kg = 1.54 / 7 × 1440 (Density of cement = 1440 kg/ m3) Quantity of cement in Bags = 316.8 / 50 = 6.336 (weight of one bag cement = 50 kg) Quantity of cement in cubic feet = Nos of bags × 1.226 (Volume of 1 bag cement = 1.226 cft) Quantity of Sand Quantity of Sand in cum = 1.54 / 7 × 2 (where 2 is the ratio of sand ) = 0.44 cum
Get price
Volume of sand required = 800 x 6. =4800kg of sand. Sand is usually purchased in tonnage in Nigeria, of which 1000kg = 1 ton. Therefore, Volume of sand required = 4800/1000. =4.8 tons of sand. In summary, we would require 732 blocks, 16 bags of cement and 4.8 tons of sand for the simple floor plan above.
Get price
In concrete, recycled fine aggregate (RFA) was used as FA. The concrete was made with its qualities and compared to 100% M-sand. The outcome of the production of standard cement mortar with M-sand and recycled aggregate replacements of 25 percent, 50 percent, 75 percent, and 100 properties among the numerous trails on 7 days and 28 days.
Get price
CEMENT - SAND - STONE relationship; In practice a 50kg of cement bag contains 2 head pan of cement; this means that if i have a plan to mix 1 bag of cement my mixing ratio would be: 1:2:4 = 1 bag of cement : 4 head-pans of sand : 8 head-pans of stone. 1:3:6 = 1 bag of cement : 6 head-pans of sand : 12 head-pans of stone.
Get price
Cement required (1 Part) = 1.86 x 1/7. = 0.265 m 3 /0.0347. = 7.66 bags (Approx - 8 Bags) Sand required (5 Part) = 1.86 x 6/7. = 1.59 m 3. We normally use Sq.m while calculating plastering cement mortar. If you want to calculate it in Sq.ft. Just convert that sq.ft into Sqm using Google Instant Area Conversion Tool and then use this formula.
Get price
Building Sand and Cement Calculator. Click here to order bricks now TEL : 010 593-0837/8/9 | FAX : 086 572-2883 | EMAIL : sales@brickwarehouse. . CALCULATOR BUILDING SAND.
Get price
Also, Read - How to Calculate Cement, Sand and Aggregate Quantity in Concrete? Material For 20 mm thick Plastering in the wall for 100 sqm. As the thickness of plaster is more, 20% of mortar may be taken to fill up the joints, unevenness etc. The Quantity of wet Mortar = 100 × 0.02 + 20% = 2 + 0.4 = 2.4 cu m
Get price
Manufactured sand (M-Sand) is a substitute of river sand for concrete construction . Manufactured sand is produced from hard granite stone by crushing. The crushed sand is of cubical shape with grounded edges, washed and graded to as a construction material. The size of manufactured sand (M-Sand) is less than 4.75mm.
Get price
We find out the volume of concrete in wet condition 1m3 (After the consolidation of Cement + sand + water). So in dry conditions, we have to add 30 to 35% sand bulkage and add 20% for wastage.
Get price
How To Calculate Of Cement Sand And Aggregate For The above calculation you can use for all Grade of Concrete but just you have to put the different Grade of concrete like M10 M 15 M20 M25 etc just here with grade of concrete you can change the proportion and the method is just above which I have discuss .
Get price
Since concrete sand is washed, it can be used in many projects that require clean sand, like bedding pipes and as a leveling base layer for outdoor projects. Masonry Sand. Also called white sand due to its light colour, masonry sand shares similarities with concrete sand and is used as an aggregate in similar projects.
Get price
Let's imagine that I want to fill a space measuring 40 ft³ with a custom aggregate costing $20 per ton. I am unsure of its density, but when buying by bulk the sand weighs 240 pounds per 4 cubic feet.
Get price
To make 1 cubic metre of concrete you need to mix 2 tonnes of Sand & Gravel Mix with 16 bags of cement. The recommended cement for mixing concrete is Boral Grey Builders Cement or Boral General Purpose Cement. Sand & Gravel Mix is available by the tonne.
Get price
In order to calculate the required quantity of Cement, Sand, Coarse Aggregates and water for M7.5 grade of concrete we have to follow 6 simple steps. 1. Assumptions. Volume of concrete = 1 m³. Grade of concrete M7.5 (1:4:8) 2. Find-out the Quantity of concrete (Wet volume & Dry volume) Wet volume of concrete = 1 m³.
Get price
In terms of the ratio for concrete, it depends on what strength you are trying to achieve, but as a general guide a standard concrete mix would be 1 part cement to 2 parts sand to 4 parts aggregates. For foundations, a mix of 1 part cement to 3 parts sand to 6 parts aggregates can be used. How much sand and aggregate do I need for concrete?
Get price
Portland Cement is sold in 47lb and 94lb bags. There are 63 x 47lb or 35 x 94lb bags of Portland Cement on a typical pallet. A full pallet of cement weighs 2,961 pounds if you buy a pallet of 47lb bags or 3,290 pounds if you buy a pallet of 94lb bags. Plus the weight of the pallet which is typically around 40 lbs. Exact prices will vary ...
Get price
Use our aggregate calculator to work out how much material your next landscaping project will require. Calculate the total volume, weight and cost. ... Our calculator has many standard densities already programmed for you - for example, gravel (105 lb/ft³), concrete (150 lb/ft³), sand (100 lb/ft³), and many more. Click on the drop down ...
Get price
Add your ' MEASUREMENT ' - Add the measurements for the surface you wish to apply the aggregates to. Step 3. Select the ' Calculate Area ' button to get your RESULTS - You'll get the exact amount you require for your given surface area, so you can buy the correct quantities you need. Type. Sand.
Get price
Quantities of materials for concrete such as cement, sand, and aggregates for production of required quantity of concrete of given mix proportions such as 1:2:4 (M15), 1:1.5: 3 (M20), 1:1:2 (M25). We assume that we have 30 cft volume of concrete and the mixing ratio is 1:2:4 (M15).
Get price
M25 concrete mix ratio is 1:1:2, made of mixture of cement, sand and aggregate in which one part is cement, 1 part is sand and 2 part is aggregate or stone mix with water. 1m3 m25 concrete weight : unit weight of RCC is 2500kg/m3 and PCC is 2400kg/m3, so weight of 1m3 M25 concrete is 2500kgs when used as reinforced cement concrete and 2400kgs ...
Get price
In simple language, Concrete is a mixture of cement, sand, aggregates, and water. 2. Calculate Cement Sand and Aggregate in Concrete The density of Cement = 1440 kg/m 3 The density of Sand = 1450-1500 Kg/m 3 The density of Aggregate = 1450-1550 Kg/m 3 Weight of Cement in 1 Bag = 50 Kg The volume of 1 Bag Cement in Cubic meter = 0.03472 m 3
Get price
How many 80lb bags of concrete do I need for 3 yards? An 80# bag of pre-mixed cement, sand and gravel ( CONCRETE ) is 0.6 cubic foot per the bag. There are 27 cubic feet in a cubic yard. So 27 / 0.6 = 45 80# bags.
Get price
36. 45. It takes quite a few bags of concrete to equal a cubic yard. The number of bags you'll need will vary depending on the weight of the bag. 90 Bags of 40 lb concrete make a yard of concrete. 75 Bags of 50 lb concrete make a yard or concrete. 60 Bags of 60 lb concrete make a yard or concrete.
Get price
How to calculate bricks, cement and sand for one cubic foot (cft) of brickwork? As we know, the area of 1 cubic foot 9" thick wall (1 x 1 x 1 = cft) is 1cft so we need 14 bricks, 1.597kg cement and 0.2340 cft sand . How many bags of cement are required for 100 sqft brickwork?
Get price
1. Quantity of Aggregate in Cubic Meter. Cubic Meter = DRY Volume of Concrete x ( Ratio of Aggregate / Sum of Total Ratio) = 1.54 x (2/4) = 0.77 Cubic Meter. 2. Quantity of Aggregate in KG. KG = DRY Volume of Concrete x (Ratio of Aggregate / Sum of Total Ratio) x Density of Aggregate. = 1.54 x (2/4) x 1500.
Get price
Now we start calculation to find Cement, Sand and Aggregate quality in 1 cubic meter of concrete CALCULATION FOR CEMENT QUANTITY Cement= (1/5.5) x 1.54 = 0.28 m3 ∴ 1 is a part of cement, 5.5 is sum of ratio Density of Cement is 1440/m3 = 0.28 x 1440 = 403.2 kg We know each bag of cement is 50 kg For Numbers of Bags = 403.2/50 = 8 Bags
Get price
Now, for the plan above, the numbers of bags of cement needed in the concrete is simply calculated by dividing the total volume of cement in concrete by a volume of one bag which is taken as 0.03. For total volume of cement in ratio 1:2:4, add the numbers together,1+2+4=7. Divide the volume of concrete by 7 to get the volume of cement in concrete.
Get price
The ratio between cement and coarse aggregate used is 1: 3, 1: 4, 1: 5 and 1: 6. The results show that the ratio of cement-aggregate volume in the ideal non-sand concrete mixture is 1: 3 where the compressive strength of the object cylinder test is 6.039 MPa with cement requirement per m 3 of 522.85 kg.
Get price
Therefore, total concrete volume required is 1.57 m 3. Calculation of Volume of Cement in 1m 3 of Concrete:-The Quantity of Cement in Concrete will be measured with the following formula :-Volume of Cement = Cement⁄Cement+Sand+Aggregate x 1.57 = 1 / 1+1.5+3 x 1.57 = 0.28 m 3. 1m 3 of cement = 1440 kgs 0.28m 3 of cement = 1440 x 0.28 = 403.2 kgs
Get price
Concrete Dry Volume (Aggregate + Sand + Cement) is equal to fifty four percent more than wet volume. Is equal to 100 divided by 100 + 54 divided by 100 Is equal to 1 + 0.54 Is equal to 1.54 Therefore, 1.54 x wet volume. Let's compute the cement quantity: 1) In m 3 = part of cement/ratio addition x 1.54 = 1/7 x 1.54 is equal to 0.22 m 3